Skip to main content

[Maintenance] 13-19 March 2026: Regular Maintenance

The regular maintenance of the NIG supercomputer will be carried out during the period stated below, in accordance with the legally mandated power outage at NIG.
The supercomputer will be unavailable throughout the maintenance period.

Period

From midday on 13 March to 24:00 on 19 March 2026 (24-hour clock)

Work schedule

  • Friday, 13 March, midday : Supercomputer outage begins
  • Saturday, 14 March : Legally mandated power outage
  • Sunday, 15 March – Wednesday, 18 March : Regular maintenance work on the supercomputer
  • Thursday, 19 March : Spare day

Main Work Description

  • Perform an overall upgrade with apt upgrade in Ubuntu Linux.
  • Updates to software outside the control of apt will be published in ‘software update information’ as soon as they are determined.

Notes

  • All running jobs will be deleted, so please resubmit jobs after the regular maintenance.