Skip to main content

(Ended) Failures due to power outage on Saturday, September 30, 2023

· One min read

publication date: october 2, 2023

Summary

On Saturday, September 30, 2023, at around 16:00 and 23:56, power outages of less than 5 minutes occurred in a wide area east of Shizuoka prefecture, affecting networks and other facilities.

https://teideninfo.tepco.co.jp/day/teiden/index-j.html

Restoration work is underway.

Recovered at 16.00, Monday 2 October.

Scope of impact

  • External network, etc.
    • SINET connection was interrupted from 23:56 on 30 Sep 2023 to 00:02 on 01 Oct 2023. (Recovered)
  • General analysis division
    • Not affected
  • Personal genome analysis division
    • Unable to send SSL-VPN tokens.
  • DDBJ Service
    • Under investigation.