The NIG Supercomputer

(Ended) [Maintenance] November 24 - November 30, 2023: Scheduled Maintenance.

The scheduled maintenance of the NIG supercomputer is scheduled on the following date and time in accordance with the legal power outage of the NIG. The supercomputer will not be available during the scheduled maintenance.

Period

November 24, 17:00 - November 30, 2023, 17:00(24h)

Work schedule

Work Description

Works for scheduled maintenance are as follows.

  1. Software version upgrade
  2. OS migration (from CentOS 7.9 to Ubuntu Linux 22.04LTS)
    • FAQ page for OS migration has been created.\🆕/
    • The medium nodes and the fat node hardware (that is, HPE ProLiant DL560 Gen10 and HPE Superdome Flex) do not support Ubuntu Linux and could not be migrated from Cent OS 7.9 to Ubuntu Linux 22.04 this time.
  3. Grid Engine version upgrade
  4. yum update for Cent OS that did not migrate OS
  5. Firmware and device driver version upgrade for InfininBand and Lustre
  6. LDAP configuration changes
  7. UPS inspection work

Software Version Upgrade Details

Table: Software upgrade plan for development/analysis

# Software Before scheduled maintenance After scheduled maintenancee
(1) Apptainer 1.1 1.2.2-1
(2) SingularityCE 3.10.2 3.11.4
(3) NVIDIA HPC SDK
(Previous PGI compiler)
22.9 23.7
(4)* NVIDIA CUDA 12.2 12.1
(5) Intel OneAPI 2022.2.0 2023.2.0
(6) Altair Grid Engine 8.6.19/8.6.4 8.8.1

*: CUDA is downgraded to 12.1 because the supported version of the Ubuntu Linux 22.04LTS GA kernel is 12.1.

OS migration (from CentOS 7.9 to Ubuntu Linux 22.04LTS)

As CentOS 7 will reach End-Of-Life on 30 June 2024, the migration from CentOS 7.9 to Ubuntu Linux 22.04LTS will be performed during scheduled maintenance.

The Personal Genome Analysis Section

Notes

Last updated: 2023-11-24