Skip to main content

· One min read

Publication date: August 8, 2023

A hardware failure has occurred in one of the redundant OST controllers in the Lustre7 high-speed storage system in the General Analysis Compartment. The controller will be replaced and the system will be taken back on the following schedule

schedule

13:00 - 15:00 Replacement work 15:00 - 16:00 Take-back work *I/O suspension occurred

System Impact at this time

No system impact at this time.

System impact at the time of the work

  • The NIG supercomputer general analysis division
    • I/O suspension of about 10 minutes will occur once on Lustre7 during the replacement work. I/O will be automatically resumed after the work is completed.
  • The NIG supercomputer personal genome analysis division
    • Not affected.
  • DDBJ Service
    • Not affected.

Please understand that it may take some time depending on the I/O status at the time of the work. Thank you for your understanding and cooperation.

· One min read

Since the number of users of GPU nodes is increasing due to the free Parabricks, we have created only for GPU nodes in the Personal Genome Analysis division so that more researchers can use the GPU node.

This new Slurm partition only charges for the time when the computation is actually running.

This reduces the time occupied by the GPU node and allows more people to use the GPU.

Along with this, the fee structure for GPU nodes has been changed from the second phase of the project.

For more information on the usage plan table and price list, refer to the following links.

Please refer to the following link for details on how to use this service.

· One min read

Due to switching work associated with the update of the storage system for the DDBJ database, the FTP service and connections with Aspera will be temporarily unavailable during the following time period.

Date

Monday, 27 July 2023, 9:00 - 15:00 (24h notation)

  • Communication interruptions of about 15 minutes occur.

Scope of impact

  • General Analysis division and Personal genome Analysis division of the NIG supercomputer
    • Login and data transfer operations using scp and HCPtools will not be affected.
    • The running jobs will not be stopped.
    • Access to the DDBJ database from within the supercomputer (access to under /usr/local/resources/) will not be affected.
  • DDBJ services
    • Downloading of DDBJ databases using FTP, Aspera and HTTPS will not be available.

We appreciate your understanding and cooperation.

· 2 min read

Until now, a part of the CPU of the GPU compute node has been allocated to short.q because the utilisation rate of the CPU of the GPU compute node is low, but in recent years, various software using the GPU has been created and the usage methods have changed, so the AGE queue configuration will be changed as follows to increase the number of CPU cores available in the GPU node.

  • Before change
QueueConfiguration NodesTotal Number of nodesTotal Number of CPU coresMemory
gpu.qThin nodes Type2b756 (8/node)1,344GB (192GB/node)
short.qThin nodes Type2b7112 (16/node)1,344GB (192GB/node)
  • After change
QueueConfiguration NodesTotal Number of nodesNumber of CPU coresMemory
gpu.qThin nodes Type2b7168 (24/node)2,688GB (384GB/node)
short.qThin nodes Type1a2128 (64/node)1,024GB (512GB/node)

For short.q, the CPU will be changed from AMD EPYC 7501 to Intel Xeon Gold 6130 due to the node type change. Please review the execution job if necessary.

Date

Wednesday, July 26, 2023 11:00 - 11:30 (24h notation)

Scope of Impact

  • During the work,

  • Before and after the work, there is no change in the method of submitting jobs for each queue.

· One min read

Publication date: June 27, 2023

Due to network device maintenance, the network will be temporarily out of service during the following time period.

Date

Monday, July 3, 2023 11:00 - 12:00 (24h notation)

  • Communication interruptions of about 30 minutes occur.

Scope of Impact

  • During the communication breakdown, login to the supercomputer and data transfer operations will not be available.
  • No jobs in operation will be suspended.

We appreciate your understanding and cooperation.

· One min read

Publication date: June 2, 2023

Due to maintenance work on SINET6 equipment, the network will be temporarily out of service during the following times.

  • Date and time: 4:30 - 6:00, Monday, June 5, 2023
    • Communication breakdowns will occur a maximum of two times during the above time period for 15 minutes.
  • Scope of impact
    • During the disconnection, you will not be able to log in to the supercomputer or transfer data.
    • There will be no suspension of active jobs.

Thank you for your understanding and cooperation.

· One min read

A reanalysis dataset of public data from the Human Whole Genome Analysis has been published by Professor Yosuke Kawai, NCGM.

" We will share Reanalysed human whole genome analysis data that have been published in public databases as open access data on the NIG supercomputer." ("Advanced Guides" > "2023" Reanalysis dataset of public data of human whole genome analysis)

· One min read

The storage system used to build the DDBJ database was replaced in April 2023 and the disk space was renewed from approximately 15 PB to 40 PB.

Currently, data on Lustre6 high-speed storage for DDBJ operations and data on GPFS1,2 storage for the previous database are being migrated to the new storage system. The data migration will be completed around July, after which full-scale operations will be started.

After the new storage is fully operational, DRA data etc. will be directly mounted from the NIG supercompute and will be available directly.

Lustre6 was mainly used for building the DDBJ database, but some users' data of the previous supercomputer (NIG supercomputer 2012) still remained. We are informing the applicable users by email. The user home directories in the general analysis division of the current NIG supercomputer is located in Lustre7, so we ask users who have received the email to transfer your data there or delete your data.

For information on the current storage types, see below.

Hardware > "Storage" High-speed storage : Lustre file systems

· One min read

In this fiscal year (FY2022), due to the renewal of the application system in July 2022, there have been some system issues with end-of-year account renewal applications. We apologize for the inconvenience. For information on how to deal with this, refer to FAQ.

In order to avoid confusion caused by the end-of-year renewal system issues, we decided to extend the end-of-year renewal deadline as follows.

Period for enewal application

1 Jun 2023 - 31 Mar 2023 (Friday) extended to 7 May 2023 (Sunday)